Tully De’Ath are providing pre-planning and detailed design on this major regeneration scheme. The scheme consists of six phases and 1000 units.

The site is located in an old quarry with Tully De’Ath providing advice and details on all aspects of transportation, highways, site level, structural configuration and drainage.

In particular, innovative proposals on site levels and road layouts during masterplanning have accommodated stringent planning constraints, considerably elevating the sites whilst still allowing defined phasing and resident de-canting.

Phases 1 to 3 have constructed seven blocks up to 15 storeys, with basements and semi-basements featuring throughout. These equate to a contract value in excess of £70m.

Tully Death are proud to have been involved with every phase of the scheme to date from master planning to detailed design, working both alongside Family Mosaic and the appointed contractors.

'Phases 1 to 3 have constructed seven blocks up to 15 storeys, with basements and semi-basements...'

Heathside and Lethbridge Project Details

Client
Family Mosaic


Architect
BPTW


Contract Value
£200m


Stage
Stage 1 & 2 - Completed
Stage 3 - Under Construction
Stage 4 - To commence early 2015